49m Ferris wheel in Indonesia
March 22, 2025
The client was introduced by an Indonesian client whom we had previously worked with. They work in scenic areas, including tea gardens.
The Ferris wheel aims to become a landmark building within the park to attract visitors.
At first, the customer was very interested in the Rainbow Slide and the 49 meter Ferris Wheel amusement products, but this was their first time importing and encountering this amusement industry, and it was also our first cooperation. To be on the safe side, the customer tried the Rainbow Slide product first.
After purchasing the first product, he became familiar with the entire import process and quickly brought a large number of visitors to the amusement park. Three months later, the client began finalizing the 49 meter Ferris wheel project. The reason for the fast pace is mainly because the customer's site is already prepared, coupled with the effect brought by the previous product, so the Ferris wheel order is finalized relatively quickly.
After the customer arranges the deposit, we will start production. During the production process, we update production videos and detailed images for our clients, including live production broadcasts, to provide real-time updates on the production status of orders. After production is completed, we take final packaging pictures for customer confirmation so that they can make the final payment.
For the subsequent shipment, the customer used their own freight forwarder. Before shipment, we provided all relevant transportation and product information to the other party's freight forwarder to ensure that the equipment could safely reach the Indonesian market and clear customs smoothly.
In the first week of production, we provided our clients with professional basic drawings for foundation fabrication. Due to various reasons, the client's foundation construction could not be completed until our engineers arrived on site to assist in the final completion of the foundation fabrication.
With the perfect cooperation of our engineers and the entire team, the entire equipment was finally installed and put into use within a month, becoming the most famous check-in destination in the area in the first place.